ABOUT

Mineral Resources set out to do something the industry hadn't: assemble a primary crusher offsite and install it whole. The approach cut a job that would normally take twelve months down to a fraction of that. From breaking ground to first ore in five. We were on site to capture it.

PHOTOGRAPHY

Excavator loading a haul truck in the pit at Wonmunna iron ore mine, Pilbara.
Mineral Resources worker in front of the primary crusher module during offsite assembly.
Two workers walking towards a haul truck in dust and low sun, Wonmunna.
Aerial view of the crusher installation site at dusk, Wonmunna iron ore mine.
Excavator loading a Komatsu haul truck at Wonmunna, Pilbara.
Loader tipping ore into a road train side tipper at Wonmunna iron ore mine.
Aerial view of road train side tippers on a haul road through Pilbara scrub.
Komatsu haul truck parked on red dirt at Wonmunna iron ore mine, Pilbara.
Mineral Resources worker in high-visibility uniform beside heavy equipment, Wonmunna.
Haul truck on a ridge against clear sky at Wonmunna iron ore mine, Pilbara.
Komatsu excavator loading a haul truck at the Wonmunna pit.
Mineral Resources worker with a tablet in front of a Hitachi excavator, Wonmunna.
Worker on the plant walkway above the conveyor at Wonmunna iron ore mine.
Two workers talking on site at Wonmunna, Pilbara.
Mineral Resources worker in high-visibility uniform and gloves on site, Wonmunna.
Worker using a two-way radio beside a haul truck at Wonmunna iron ore mine.
Excavator bucket raised against a clouded sky at the Wonmunna pit.
Mineral Resources worker holding a handheld device on site, Wonmunna, Pilbara.

APPROACH

We were originally booked for a single shoot. Once we got on site and understood how significant the crusher install was — an industry-first approach compressing a year's work into months — we flagged it with the comms team, and a one-day job became a project dedicated to capturing the whole thing. We filmed the install as it happened, from offsite assembly through to the crusher in place and running, with the focus on the innovation and the safety that made the timeline possible.

IMPACT

The film gave MinRes a record of a genuine industry milestone. Proof of an approach that compressed a twelve-month install into five months without trading off safety. The direct feedback was that a video highlight, embedded into board and investor updates, was understood immediately in a way a written report couldn't match. The innovation, the pace, and the capability behind Wonmunna landing at a glance.